Highway 52 Design - Build Project
Location: Rochester, MN
The largest ever one-time project ever let by Mn/DOT
Date: 2004-2006
Facts:
- 11 miles of concrete pavement
- 24 Bridges
- 11 interchanges
- Sound abatement walls
- Utility Pipe, culverts, manholes
Contractor: Zumbro River Constructors
Ready Mix Supplier: Ready Mix Inc., Rochester, MN
Concrete Paving Contractor: Progressive Contractors, Inc.
PreCast Concrete: Crest Precast
Utility Pipe: Royal Concrete, Stacy MN
GRT Admixture Products:
- Polychem VR
- Polychem KB-1000
- Melchem
- Polychem R
- Super Set
- Polychem BP