click to enlarge
click to enlarge
click to enlarge
click to enlarge
click to enlarge
click to enlarge

Epic Systems Corporate Campus

General Contractor : J.H. Findorff & Son, Inc.

Project Engineer: Magnusson Klemincic

Project Architect: Cuningham Group & Zimmer Gunsul Frasca Architect

Ready Mix Supplier: Wingra Redi-Mix

Construction: 2004-2005

Project Facts:

Unique award winning project located on 350 acres of rolling hills near Madison, WI. Project includes a three-story office building structured over a below grade, three-level post-tensioned underground parking ramp. Due to occupancy requirements by the owner, four office buildings and one parking ramp were constructed on a parallel schedule instead of a consecutive schedule. This fast track schedule entailed using high performance concrete to ensure the schedule was met.

This project utilized 35,000 cy of poured in-place concrete. 20 different mix designs were used throughout this project.

GRT Products:

Melchem – Super plasticizer

Polychem CI – corrosion inhibitor

Polychem AE – air entrainment

KB-1000 – mid-range water reducer

Polymesh – synthetic reinforcing fiber






General Resource Technology
2978 Center Court - Eagan, MN 55121
Phone: 800-324-8154
Fax: 651-454-4252
©2010 General Resource Technology - All rights reserved.