click to enlarge
click to enlarge

Pinnacle Casino

Location: St. Louis, MO

Construction Date: 2006-2007

Architect: Hellmuth, Obata + Kassabaum, Inc (HOK)

General Contractor: McCarthy Building Companies

Concrete Contractor: Vee-Jay Cement

Ready Mix Supplier: Metro Materials

GRT Products Used:
- Polychem AE: Air Entraining agent
- KB-1000: Water Reducer/Finishing Aid
- Super Set: Non-Chloride Accelerator
- MCI 2005 NS: Migrating Corrosion Inhibitor

Project Description:
On the banks of the Mississippi, in the shadow of the famed Gateway Arch in St. Louis, MO the $350 million Pinnacle hotel, casino, parking garage and retail area was constructed. The schedule required high performance concrete throughout the project. The mixes varied from post tension parking decks, architectural finished form work to high strength columns and foundations. GRT's chemical admixtures were used throughout the project to provide the necessary concrete performance needed during the cold winter conditions to the hot summer conditions in St. Louis.






General Resource Technology
2978 Center Court - Eagan, MN 55121
Phone: 800-324-8154
Fax: 651-454-4252
©2010 General Resource Technology - All rights reserved.