Wind Generation Electricity Projects

Owner: Florida Power and Light

Contractor: D.H. Blattner and Sons

Ready Mix Supplier: Bauerly Brothers/Concrete Mobility

Location: Central Texas

Total Cubic Yards: 120,000

Time Frame:January 2005 - May 2006

GRT products Used:Melchem - M super plasticizer & 400 NC - Type A Water Reducer

The concrete for the tower bases had a strength requirement of 5,000 to 6,000 psi in 28 days. High slump, high strength concrete was needed to place and consolidate the concrete with the large amount of steel reinforcement . The concrete also required extended slump life for the long haul to the project. The schedule dictated 1,500 - 2,000 cubic yards of concrete to be placed each day. This project was located in a remote region of central Texas which made delivery of materials a challenge. GRT dedicated two admixture trailers with full dispensing systems to service this project.






General Resource Technology
2978 Center Court - Eagan, MN 55121
Phone: 800-324-8154
Fax: 651-454-4252